Port Harcourt's
spec-first contractor.

We do not improvise engineering work, we contract it: scoped in writing, quoted in writing and executed against the drawing. That is the whole company, applied to welding, fabrication, oil & gas support, procurement and manpower.

2025

Incorporated in Port Harcourt

04

Lead service lines

19

Registered lines of business

1 day

Written quote turnaround

Who we are

A Port Harcourt engineering services company serving Rivers State and the wider Niger Delta. Coded welders, fitters, technical crews and a procurement arm, carried by one habit: putting the job on paper before putting tools on it.

The person who scopes and quotes your work is accountable for delivering it. The same team carries a job from the first written scope through execution, handover and whatever support comes after.

At a glance

Legal nameAchuremi Global Resources Ltd
RegistrationRC 8577907 · TIN 33317672-0001
BaseNo 102, KM 5 East-West Road, Rumuodara, Port Harcourt
CoverageRivers State · Niger Delta · registered to work anywhere
ScopeWelding & fabrication · oil & gas · procurement · manpower
StandardScoped in writing, quoted in writing, executed to the drawing

How a scope gets a quote

Four questions. All four have to be yes, or we tell you no instead of quoting anyway.

01

Is the spec written?

Drawings, standards or a written summary. If the scope only exists in conversation, we put it in writing before we price it.

02

Is it inside our scope?

Our registration covers nineteen lines of business. If your scope falls outside them, we say so instead of improvising.

03

Can we hit the date?

A delivery date we cannot keep is not offered. The date on the quote is the date we plan crews and materials against.

04

Can we source to spec?

Materials are priced from real supply. If a grade or fitting cannot be sourced in time, the quote says so.

The three things we hold fixed

The written spec

Every job starts as a document both sides can point at: the drawings, the standards, the quantities and the exclusions. Ambiguity is settled on paper, before it becomes rework on site.

Scoped in writing, every jobStandards stated on the quote

The committed date

The delivery date on the quote is a commitment we plan crews and materials against, not an opening estimate. If the date moves, it moves in writing, with a reason.

Quoted within one working dayDates planned, not guessed

The documented handover

Work is inspected against the specification and handed over with supporting documentation. Sign-off happens before close-out, not after the invoice.

Inspection against specDocumentation supplied

What our registration covers

Memorandum of Association · certified 25 June 2025

Welding & fabrication worksSupply of welding & fitting materialsMetal worksManpower supplyCivil engineering & constructionSupply of steel materials & pipesOnshore & offshore servicesImport & export of general goodsFacility managementOil & gas servicesPetroleum products distributionAgriculture & allied servicesConsultancy servicesProcurement servicesGeneral contractsGeneral merchandiseBuilding materialsSales & distribution of general goodsEvent planning & management

How a project runs

Six stages, the same six every time, and the last one keeps going after the invoice.

01Contact

Send your scope through the form, by email or by phone. A person replies, not an autoresponder.

02Scope review

Drawings and standards are read, gaps are queried in writing, and we visit the site where the work needs it.

03Written quote

Within one working day: itemised materials and labour, the standards we will work to, and a committed date.

04Mobilise

Crews, materials and equipment are scheduled against the agreed date. You see the plan before work starts.

05Execute

Work proceeds to the agreed drawing and standard. Progress is reported as agreed, and changes are priced in writing before they proceed.

06Handover & support

Inspection against the specification, supporting documentation supplied, sign-off before close-out. We remain reachable after the invoice.

1 2 3 A B 3 600 TYP 4 200 3 × 6" PROCESS LINES CABLE TRAY 300 EL +2 500 EL +4 200 AGR-MOD-007 PIPE RACK MODULE · ISOMETRIC ACHUREMI GLOBAL RESOURCES · STRUCTURAL MODULE SKETCH
AGR-MOD-007 · Pipe rack module isometric · structure, lines and tray coordinated as one scope

One standard,
in writing,
on your job.

Send drawings, a materials list or a short written summary. We reply within one working day with a written quote.

Request a quote